1 October 2026
For two Tauranga-raised Navy engineers, a posting in Singapore has meant long days aboard HMNZS Canterbury rather than much time exploring the region.
Lieutenants Cat Enticott and Philip Kim are helping coordinate the logistics vessel’s five-year maintenance programme during a six-month stay at Tuas Shipping Yard. The work includes a diesel engine overhaul, a galley refresh and an engine control upgrade. The ship’s ballast water treatment, sewage treatment and monitoring systems are also being refurbished.













